Public Procurement IV - Transcript
00:00:00
Alright, sir, let's get started. Welcome, Mr. Khalid. Khalid, you’re right on time today, mashallah. Okay, show me all the slides—not like this, not like that, not towards me. Show all the slides, small and full-screen, the ones at the bottom. Move forward, then backward, no, forward. Wait for one minute. Now move forward. The next one, then the next one. The one below, the one below this, yes, that one. Okay, alright. Assalamu alaikum, everyone. I hope you didn’t see “procurement procurement procurement” last night, right? Because we talked about it so much yesterday.
00:01:20
Yeah, your idea is pretty good. This is what we call a uniform requirement across the entire KP—all your needs are the same everywhere. Only the quantity increases. And the major equipment you mentioned, the specialized stuff, is also the same for everyone, whether it's in the form of servers or directions from the High Court. Another point is about the funds you get, which you often mention—if they come, the funds will be earmarked for their respective courts, specifically for their respective districts. But...
00:01:52
The procurement will happen right from there. This was a really good idea that came up in 2015. The World Bank gave it, and you all were also involved. Back then, I was at KP PEPRA. Actually, two were set up, five were supposed to be made, and one DG Healthcare Centre Life Procurement Cell was formed, which has been doing great work till today. There was one more department. At third place, we thought a High Court would be established, but it couldn’t happen. Not sure why. What were the circumstances? Sir, it got so delayed because of their reasons, suggestions, and stuff above the High Court level.
00:02:41
If you just set up one procurement cell with specialized procurement people, trust me, your life will become so much easier. The amount of attendance you're taking right now, you don't even need that. Just have the civil works engineers sitting right there too, and they issue you a complete list—like this paper requisition, this is the rate for that item. You just place orders as and when required. You can handle big equipment orders yourself or have them do it, and they can manage the rest of the smaller and bigger procurements there. Then you...
00:03:07
You’ll be able to fully focus on your work too. This is a really good idea. Absolutely. Sir, I only share my number with you guys, and it’s on the next slide as well. Sure thing. Just one request—I always make sure I haven’t missed any calls from you. I haven’t attended a single call from you yesterday because I haven’t put my phone on airplane mode yet, but I’ll do that soon. Send me a voice message, and I’ll definitely get back to you. Let’s just quickly go over what we covered yesterday, maybe take 2 minutes for it. I’ll handle it, so you don’t have to. Yesterday, we first went through the legal framework. Alright, sir. We studied the procurement part in that.
00:03:45
We studied the definitions. The standard bidding documents, the bid-side evaluation documents. Besides that, we went through the differences in the bidding documents. Then we read about the procurement life cycle, starting from the need assessment. We covered everything—the involvement of the procurement plan committee, development of bid documents, then publishing them, evaluating the bids, announcing results, handling any grievances if there were any, and finally awarding the contract. That was the process: a planning phase, a tendering phase, and a contract management phase. After that, then...
00:04:19
I taught you the methods of public procurement. There were three methods: Open Competitive Bidding, Restricted Bidding, and the third was the Alternate Method of Public Procurement. Then, we covered four procedures: 1-1, 1-2, 2-1, and 2-2. These were the four procedures we studied. After that, I talked about the procurement plan and how important it is. There's just one format that anyone can easily fill out according to their allocated budget. Then, we studied advertisement development, where I especially emphasized the importance of keeping the response time in mind.
00:04:50
You don’t have to put the brand name inside. You also shouldn’t involve the Khyber Pakhtunkhwa Revenue Authority for the goods. I talked about that and the pre-bid as well. After that, I think we finished with everything yesterday. Today, we’re going to study the alternate method of public procurement. We also covered pre-qualification yesterday and touched on post-qualification. I mentioned that there are three methods in total: one is open competitive bidding, the second is restricted or pre-qualification. We've gone through both of those. Today, we’ll cover this one.
00:05:18
We're going through the third method. It’s not necessary to acquire or procure everything through open competitive bidding. There are situations where you can directly procure without going through the tendering process, except for Class One repeat orders. From here up to the next slide, none of the direct sourcing mechanisms have any restrictions on the amount. There’s no limit like you can only do up to 5 lakhs or 20 lakhs. You can even do procurement worth a billion, except for Class...
00:05:59
Number one. Because the problem is you can’t go beyond 15%. But I’ll explain everything now. Honestly, I shouldn’t even say this. Even last night, one of our senior judges had received some money like that, and when we talked about repeat doubt and stuff, I told him, “No sir, that limit has already been crossed.” Then you might say, “Now you’ll have to go for fresh tendering.” I told him that last night. He was asking how much further can I push this, and I said, “You’ve already crossed your limit. Now you need to go for fresh tendering.”
00:06:27
He said the tender is fine for now because there’s no urgency. When there is an urgency, say around May or June, which I also realize, those are the scenarios where you don’t really need to go through tendering. No need at all. You can just check the newspapers. There’s no need to go through that process. You can source directly. Repeat orders—like the word suggests—are orders you’re placing again. That’s what this term means to all of us. It basically means if you’ve procured something previously, then...
00:07:00
If you’ve issued any purchase orders within the last six months, the law says that no matter how big the procurement is, as long as these five things I’m about to tell you are met, don’t worry about it. You can place the order directly. This is important to note because it’s not mentioned anywhere else. Number one: it has to be the same contractor. Let me give you an example. Say you started procurement in January for different items like medical equipment, computers, servers, UPS, and inverter batteries—you got all these things.
00:07:36
We had everything — solar too, everything was covered. We placed an order worth around ₹5 crore. We advertised in January, did the proper evaluation in February and March, and only by March 31 did we give the order to the successful builder, telling him, "Go ahead and get the stuff." The items could be divided — one got the computers, another got the solar, one got the multimedia, and one got the UPS. That doesn’t matter to us for now because it’s quiet here. We placed a ₹5 crore order, or basically gave it all to one guy.
00:08:12
Go and get everything. You placed the order on March 31st, and on May 12, 13, 14 or June 12, 13, 14, you got another crore. Yeah man, spend it, no pressure. Go ahead. Now obviously, if I talk for myself, I'd say this is crazy—trending over and over. But for you, it’s a headache. For me, it’s work; I’m just overloaded. But for you, the worry is, what should I do now? The best legal option for that is Rule 10, Clause C, repeat order. Under that, you can ask the same contractor to write this.
00:08:51
Here's the deal. If anyone wants to write something, go ahead and write it. Same contractor, same commodities, within six months from the purchase order date, not more than 15% of the contract value. Keep these five points in mind. Same contractor, same commodities, within six months, not more than 15% of the contract value. Let me repeat: same contractor, same commodities, from the same items, within six months, not more than 15%. That’s basically what I said, this was the order.
00:09:50
Same contractor, same commodity from the date of purchase. Yes, 15% of the contract value. Have all five conditions been met or not? If not, then skip it. Same commodities, same commodities every six months. Fourth point, fifth point: 15% of the contract value. Sixth point is the same as the fifth. Just write the same price, same price as the contract or the contract value from the previous contract you had on March 31. Clear this up first. Make sure all five points are at the same value or same price on this.
00:10:29
We’ll discuss this. It's good, we’ll talk it over. No issue, same contractor, same items within six months, third point: not more than 15%. Fourth point and last: same price or same value. Yeah, that’s the matter now. We’ll discuss this. I’m coming to your point. You’ve noted it, so I’ll move ahead, okay? On March 31, we gave an order to Sir Saeed to go and get these things. We received crores on June 12. We’ll call them and sit with them. Now, what’s 15% of 5 crores? That’s 75 lakhs. That’s what he says.
00:11:19
We need to place a tender for over 5 lakhs. Up to 75 lakhs, we can work with them without going through the tendering process again. Out of the same items you used to handle, I got four counted—if they agree on those, try to negotiate at the same price. I know pricing is an issue here. Just try, and they'll agree. They've already kept a good margin for you guys because two months have passed, so they're happy. They've got another 75 lakhs worth of business. But if they don’t agree now, you’ll have to show a little flexibility—just about 15%.
00:11:54
Finish it within 75 lakhs out of the 75 crore value. Don’t use even a single amount above that. Sir, negotiation is the only solution you have. If Love is like this, then yes, you are 100% right. And Inshallah, the same Irfan sir who will teach you tomorrow online, his stance is that the word “price” isn’t mentioned there, it says “value.” The total contract value was 5 crore. So, within that value, you gave 15%. That’s their stance. The word “price” isn’t written here. The cost got higher, and this is what happened on our side.
00:12:39
A month ago, and then two months later, if not then, you had said something else, but there was no response. Madam said something that reminded me of another really important thing—repeat orders. It’s another term. If you want to understand, it’s a crucial term for your big projects: change order. This is also written in the standard bidding documents from Kera. The change order, as Madam mentioned, means we can increase or decrease it. So, if you don’t have 50 million but only got 40 million, you can adjust it accordingly. And there’s one more important thing...
00:13:29
Let me tell you something. If they really enjoy this, then understand this—there’s a 5 crore order just sitting with you right now, but you haven’t placed the order yet. And even before the order is issued, you could get another 75 lakh or 1 crore order. Before issuing the order, you can give them 15% at this stage, and after awarding the contract, you can give another 15%. This 30% is what we call a change order for this activity. Am I making sense? The 5 crore order was there, but you haven’t issued it yet. The successful bidder was finalized just yesterday or the day before.
00:14:02
Hopefully, the video will be finalized. We need to issue them the Letter of Award, but instead of 5 crores, let's make it 5.75 crores in that Letter of Award. After that, your step is done. Then, once you issue 15%, you will give it. This activity is called a Change Order. A Change Order is not a Repeat Order. A Repeat Order is when the contract is signed and given to the successful bidder—that's called a Change Repeat Order. But right now, before issuing a repeat order and before awarding the contract, the activity is called a Change Order. It can involve an increase or a decrease.
00:14:38
Very good, very good. Exactly what I couldn't say, yes, it's all good now. Sir, you gave me the printer as per the requirement. I left the printer and gave the item. The item will be there. If you've advertised it, then look, out of five, don't see two. There's no question of repetition here. The item-wise quantity is the same, one of those items is repeated. I want to ask, I have ₹1 lakh and a budget of ₹1 lakh for plant and machinery. I said, which plant machinery item do I need? You issued that.
00:15:46
Around June, I'll need more money from you, your money, and I can call the previous printer order a repeat order. As for what I told you yesterday about the standard item you advertised till Prime, when the budget comes, payments will be made to you, and you'll be given the items. The payment price could be higher or lower, depending on finances. So if you make purchases based on that, the first things you have will be used up first. Over time, everything will adjust. If you don’t have 10 donations, it means... about what you did, 15%, 15%, 5 million.
00:20:56
The biggest problem for you is 15%, and your audience is the biggest issue. So, what will always happen? Sir, 15%—this isn’t just a question, it’s a good point. After that, I’ll explain the biggest thing for you. When you have this, like on the 29th, the sentences are simple. Those who want to avoid problems, this is the best way to expect good results, and I’m taking responsibility for this. Since you have a problem, maybe it's just a little. We did the same thing with the same amount, and you can also convert this into decimals.
00:27:14
Why are you the head of this video? This video is yours. Inside you, there’s financial stuff, and you can also add more. You can put your instructions into conditions. If it comes to me, we’ll handle it too. And if there’s 15%, the same thing applies—up to 30, within the job. Understand this thing, tell me, note it down: Rule number 39. This is the mother of all—39 months is the mother. We’ll decide based on that or how. Sorry, whatever terms and conditions you decided, that’s what we’ll follow. So if you write that, it will apply to you and will be used accordingly. You can do that if you get it.
00:29:11
The condition stays the same, nothing’s changed. It’s not that easy anymore. We said, whatever you are, there was also a transportation issue with 30. After that, the third thing is to do it in your own way, play according to your method. But don’t be inconsistent with the rules. It shouldn’t be something weird that’s not even in the rules, okay? The rules cover you everywhere. Our part—not a repeat order, no, this won’t become a repeat order, madam. A repeat order usually happens when you do a one-time procurement for one place.
00:30:35
But sir said the issue is that this fund either keeps coming randomly or sometimes doesn’t come at all. So whenever it does come, we should put a condition in our bid solicitation document stating that these are our tehsils, and if you get work there in the future, the bidder will be bound to provide it at these rates and install it. This condition should be in the bid solicitation document, not in the advertisement. You cover the entire year in the document, meaning up to June 30th. Should I go ahead from here? Anything else?
00:31:16
So ask. What’s next? Should I go through government organizations? Who better to know an example than you? Yeah, like Pakistan German SIDB, Pakistan German—okay, government organizations like Hazara FDC, SIDB Pakistan. Who? Yeah, what have they done? Alright, if they’ve already got themselves recognized at the government level, then maybe, just maybe, it can happen. If it can, then definitely do it. The government sets the rates for these things, like where the procurement concerns for acquiring spare parts come in. Has there been something you’ve taken on lease and dealt with?
00:32:05
If spare parts and supplementary services are running, the condition is that the provided ones are the same and not available from the other floor. This is the kind of class that has been procured somewhere before, but there’s a compatibility issue. I’ve already explained this to some people, and they understand. But for those who haven’t had training from me, I’ll have a quick one or two-minute discussion. How many of you have ever had an MRI or a CT scan done in your life? Anyone here? Have you? Ma’am has. Ma’am, you’ve had it done, right? Do you know what a CT or MRI is?
00:32:39
A person is laid down inside it. And with a regular X-ray, once the print comes out, you get a big X-ray film from the printer that you can take to the doctor. But with an MRI, it’s a bit different—there are about 25 different types of X-rays for the different parts of the body. When we lie down, a bunch of shots are taken from above, like lights shining on us, and that gets into your eyes—that’s how the shots work.
00:33:05
When someone comes in for a scan, this thing, called the tube, starts taking X-rays. The tube costs around ₹1.70 crore. The machine itself costs about ₹4.70 crore, and the total price of the machine is roughly ₹445 crore. I'm talking about the CT scanner here, and an MRI machine costs about ₹7,275 crore. This machine can handle up to 200,000 scans. After 200,000 scans, there’s a problem—it has to be replaced no matter what. Once it hits 1.70 crore scans, the machine starts blinking, signaling that it’s time for a change. So...
00:33:39
We can tell that this will be over in the next two to three months. Now, about what's installed in Mardan – that's Toshiba from Japan; the one in DI Khan is from GE; the one at HMC is Philips; and the one in KTH is GE again. GE is installed on the GAS Sims too. Under this category, a Philips tube can't be put in a GE machine, and GE tubes can't be used elsewhere; Siemens tubes can’t go into GE machines, and Siemens tubes can't be used in GE machines either. So, all of us MTIs, wherever we are...
00:34:11
There’s an MRI or CT scan near the hospital. We directly contact our authorized dealer, who is the original manufacturer based in Toba, Japan. They have suppliers in Pakistan, and we deal with those suppliers. They have only one supplier who is an authorized dealer. For example, here we have Medicubes, which is related to Toba Japan, and Philips’ authorized dealer is Friend Traders. All these are authorized dealers for them. It’s not like I can just go and ask the ma’am to get it for me. She is a general order supplier for me, but you are the authorized dealer. You have the sole rights for that.
00:34:43
You can get Tasheeba from wherever you want, and you can also give it to me. The thing is, since the provided data isn’t available from another source, and our supplementary services are also charged in dollars, we currently have an $80 yearly contract for MRI, which costs around ₹80,000. Why do we do this? The benefit is that if you bring it, I won’t even notice it after two days. You're stuck because you pay me ₹80,000 every year, and the amazing part is you never let my machine stop for even a minute. If the CT or MRI machine ever stops, it immediately ends up in the newspapers that something happened.
00:35:17
The machine at the place either stopped working, or their service level agreement had expired. Or sometimes, the parts just aren't available anymore. It's a one-off thing. The machine is out of order, completely. This rarely happens. Otherwise, the media would spread rumors that a certain institute's CT scan or MRI is down, which would be a huge embarrassment. So, at MMC Mardan, we pay ₹80,000 for supplementary service and about 1.7 crore rupees for its tube. Provided the same. There's no audit objection on this, nothing at all. That's what they’re saying. Although it’s more than 5 lakhs.
00:35:48
Yeah. It’s something that only they have in the whole world—no one else has it. Only they do. Want an example? Got one in mind? WHO’s endophoron injection is one that people all over the world get from there. The KP people get it from there. The folks in Punjab get it from there. Even the guy in Canada gets it from there. WHO has the rights to make that injection. Just recently, like seven or eight months ago, when I was handling the cardiac tender, before the bidding ended, there’s this machine called Rota and...
00:36:22
The guy's name is Rota. He's German. Must've made it sometime in the past, not sure if it was in '55, '56, or '75. The machine is called Rota. It's used during open-heart surgery for heart patients lying down. It inflates all the narrow veins inside the heart, fills them with air, and then starts cleaning from inside. There's nothing like this anywhere else in the world. Only Rota makes it, and everyone gets it from Rota—whether it's us, KTH, people from Lahore, or from India. Rota.
00:36:52
We get it only from them. If I talk about ISO certification in Pakistan, like for service—there’s OPS QC in Karachi, right? That’s the one authorized to handle it. So whenever you need ISO certification for your service, you have to go through them. Clear? Should I go on? Here’s the first example, something common—daily, monthly, then 15 days, weekly, or daily fuel supply. You’ve probably never seen a tender in your life saying, “Hey, the newspaper says this much petrol is needed for some department.” For vehicles—almost as many as there are in the world.
00:37:31
So, even with public procurement, there’s a framework—vehicles are always bought directly. Whether the session judge from DI Khan gets a vehicle or the one from Chitral does, the price is the same—like, say, ₹27,300. The only difference is where the extra costs come in, like transportation. If anyone from that area—like a district and session judge from Hyderabad or Chitral—gets a vehicle, the price is the same. The only differences will be in taxes and any applicable fees, plus transportation. Now, tell me, where else would there be a difference?
00:38:09
What's the difference between emergency and urgency, Sir? That was your question. So, what's the difference between the two?
Both are legal terms, like Rule 32 and Rule 34A. Medically, it makes sense too. Urgency means something that requires immediate attention or action—something urgent that needs to be taken care of quickly.
Emergency, on the other hand, can refer to any kind of emergency. It's usually announced by the government.
So, emergencies are government-related issues that are always declared officially by the government. These declarations typically last for 90 days.
00:39:13
It happens. If you want to go beyond 90 days, then you’ll have to extend it. You’ll have to extend that same notification. You know, the COVID leave was initially for three months back in February 2014, and then it got extended and went on for about two and a quarter years. Remember, it was 90 plus 90 plus 90 days, and it lasted for over two years. The emergency department had a specific issue—God forbid, but it did happen—there was a blast in Mardan, a wall collapsed, everything. That was last year. Then there was a full blast at the police lines with 8,085 people, in front of the secretariat. There have been a lot of such incidents. God forbid, don’t let it happen that if even a little more time had passed...
00:39:49
If they blasted the gas pipeline in the cardio section of MMC Maddan, I would have asked for a tender, but went there myself instead. If by chance the ICU’s generator blows up, they don’t go for a tender. Brother, the situation is such that it’s an emergency, and both are equally serious. The disaster infrastructure you were mentioning, sir, all of that comes into play here. Death, environment—everything is involved. The only difference is that this usually lasts for about 90 days. There’s no fixed time limit for it. Also, there’s no limit on the amount of money involved—it could run into billions.
00:40:24
No worries. Ma'am, yesterday you told me it was half the case. We'll hear half. This falls under that. This comes under emergency. Got it? Now, the difference between these two—this and emergency—is just that. This is a good move, and when something goes straight to the Deputy Commissioner, it’s like a do-or-die situation, you know? Sometimes, things just can’t be helped. Like, elections happen, and all that. Now, God forbid if there’s an emergency declared here in KP, then a lot of orders will come out. Then either this will be covered as emergency, or if an issue arises in a particular district, then...
00:40:57
It's an emergency, and in your area, I should take forward what Madam said about the emergency. If the emergency is declared across the entire province, it’s the Secretary of Administration who declares it, based on the Director's direction and the CM’s orders. This is mentioned in the NDMA Act, and also in the PDMA Act. If the emergency needs to be declared at the district level, as Madam said, only the DC can declare it. The SPRD states that the information and intimation will be given at the provincial level to ACHI, and at the district level, it’s also mentioned that payment of bills will be...
00:41:40
You just need to take care of it. Let me clarify why—because they need to know that within these 90 days, all the bills that come in must be fully cleared without fail. If there’s an emergency, then check the tendering process. Here's another point: whether it’s an emergency or not, the entire procurement process stays the same. It’s not like in an emergency the boss just sits and issues orders randomly. Only two things are reduced in such cases: one is the advertisements, and the other is the response time, which gets shortened from 15 days.
00:42:13
The rest of the process stays the same. The committee will do it too. The committee will recommend it to the sir or madam. If the person sitting in Chitral recommends it, two things must happen: response time and advertisement. Everything else will be the same, and it’s written down. The very first line says this. Rule number 3, parts 2A and B—specifically B—talk about emergency situations. There are no special circumstances mentioned except in rule number 34. If you want, you can read the details there. But since it’s a department domain issue, right now, here’s an example for you.
00:42:50
In 2019, when the district got merged with Theta in KP, we had FATA district on our side. Back then, we had nowhere to sit—no travel, no pen. In this situation, can we apply saying we had this kind of emergency or not? Okay, you say the place was completely empty, nothing at all, and yes, there was a building. So, in this situation, tell me—did we even have a computer to issue the tender? We didn’t even have a phone to make calls for operations.
00:43:34
There wasn’t even a caste involved. So, in this situation, since you went there as the head, for example, if you take permission from the High Court under Rule 34A to proceed with things initially up to a certain point... where is it written that you need the High Court’s permission? It’s not written anywhere. Do you have your own authority? Were you given some power to go and handle everything? Which judges are supposed to make any extra decisions? If I’m talking about open competitive procurement contracts just a little bit—
00:44:02
I'll go up and give it. We've done the tender and all, but you go ahead and do the initial part, and also upload the tender. It's nothing big. No big deal. If you look at the situation with the contract, usually in courts, there are two or three courts or districts where the situation is such that if a fire breaks out, damage can happen—whether it's the record room, courtroom, or the CCTV system. In such cases, it's an emergency and you can collect, so then the District Collector's approval is not needed. Otherwise, Judge, what funds are available?
00:44:41
Don't ask me about funds, I can explain the scenario. Where the funds will come from, that’s for you to figure out. Just make sure to cover the emergency—no one else is handling it. The district government took care of that. Emergency, emergency, emergency—you don’t even need me to explain it so much. Anyway, let me just say one last thing before I take your question. Go ahead, ask your question. Please be kind, like in an emergency. I’m not sure about you, but seriously, you should be careful. You’re crossing the line—it’s part of your culture, your organization’s style. This file is about emergency stuff, so..."
00:45:42
Pay attention. This is some pretty technical stuff. There are about seven or eight things you need to keep in mind. First off, administrative approval is usually at the very bottom—that's how the file order goes. I'll explain the general routine at the end. Always keep the emergency files properly maintained. You shouldn't mess around with those. I've seen cases during COVID where people got into serious trouble with the vigilance department just over a difference of two and a half rupees or two rupees. Because two and a half times 2.5 multiplied by how many crores? Things spiraled out of control, and it messed up their careers big time. However...
00:46:13
Back then, the procurement guy was under pressure to do this. He wasn't at fault, and I still say he wasn't to blame. The main thing is, whatever the situation, try to sit him down, hold his feet, and keep him on board. Give the pricing responsibility to the lower-level guy instead. It's not the end of the world if you don't take it. Always keep your paperwork straight. It's wrong, but it’s important to say it—keep your documents in order. There’s no such thing as an emergency on the IPD, there’s actually no emergency at all. Everything falls apart when there’s no advertisement. Administrative stuff comes first.
00:46:48
After approval, quantify exactly how much is needed—don’t go overboard. Because that's exactly what's written in the 90-day law, rule 3.2. Take just enough to cover the full 90 days, and at the same time, start your procurement and tendering process in parallel. This is also mentioned in the same rule. You must have read it, and also inform the AG Office or the Accounts Office that no process will be done after 90 days for any bills that come in. You keep making payments to us so we can pay on time quickly; otherwise, they’ll hold it up. That’s one thing too.
00:47:18
Here’s the thing. First of all, since you’re writing, let me tell you—you need to get notified or administrative approval first. Second, quantify exactly how much you need to get. After that, if you have to approach one bidder, or if there’s just one, get their price quotation and negotiate—like, they said 250, but I got it for ₹22. If there are three bidders, even if it means fudging the paperwork a bit, go for the lowest one and give them the purchase order. Clear? Yes, sir. After that, the most important thing coming up is...
00:47:52
There are two things: when the stuff arrives, you have to count it—like if you ordered 5,000, 6,000, or 10,000, you need to count exactly that much. Enter that count into the stock register and then confirm that this is indeed what came. If you’re the head there, you’ll write that, yes, I’m a technical member, I’ve checked, and the stuff we ordered is exactly what arrived, with the same respect and quantity. If they write this down, then there are like five or six more things related to the body, sir. And in an emergency, always ask the right questions. I won’t let this slide. Why?
00:48:44
You don’t need to get distracted for no reason—how much total fund is there, how much is left, it’s not in lakhs, right? So why not just do one more thing: why not go for three quotations? Give one to one vendor today, buy one item; next day, give another to a different vendor, buy something else under 5 lakhs. Don’t repeat the same thing. Then the only fault you’d have is splitting the purchase, and splitting is a fault, sure, but it’s not that big of a deal. Just mark it from here—right, right, right—put it under different small heads, as long as it’s under 55 lakhs.
00:49:45
So, the amount comes to around 20.25 lakhs when you combine everything. Why split it into small parts like 5 lakhs here and there? How much is left for solar? If you want to get tricky, you can take half the batteries, half the solar panels, then separate the cables, and keep asking for more tricky ways—whatever you do, just get the system running, alright? Moving on. Any questions here? How do we do emergency cover and big evaluations? We'll look at the evaluation criteria that the committee made. Yesterday, I told you that you have a standard bidding...
00:50:35
I had already explained the document format. I taught both Part One and Part Two and emphasized strongly that this shouldn't happen again tomorrow. You might ask me, what is this about? Part One stays unchanged. Part Two has procurement-specific changes, which I had already told you about. Among those procurement-specific changes, I mentioned there’s also an evaluation criteria that the committee needs to create and upload on e-pad along with the same terms and conditions. That’s what I said yesterday. So, what is this evaluation criteria? It’s roughly about the eligibility we went over yesterday.
00:51:03
That qualification criteria plus some other things together make up the evaluation criteria. So, what’s the eligibility criteria? Last night, by chance, I was scrolling through Facebook. It’s true that just 24 hours ago, a total of three people cleared the judiciary exam. I saw this on Facebook yesterday and was really surprised. I didn’t save it on my phone, otherwise I would’ve shared it. I had it open on my laptop and was really shocked. One of them was from the Waziristan side. There was a girl, from somewhere called Madden or something.
00:51:40
Only three guys actually qualify at the eligibility stage. Nobody really studies for CSS, PMS anymore. Maybe it’s our time, but if I just keep going like this, trust me, sorry, you’ll lose your point. That’s my nephew, my real nephew. He’s my second favorite. He’s an international troublemaker. International troublemaker. International. I’m telling you, if you ask him how to spell economics, he won’t know. And for Pakistan, believe me, he got an A-one grade that day. He got an A grade in FSC Inter Science. In Inter Science.
00:53:26
I said, dude, how did this even happen? They say Maamu used to give ice cream after meals at the camp. Just imagine the people who set these exams. What you're telling me, I'm shocked. I said, man, what are you even saying? We used to study our asses off and still come back with first division. Back in my day, those guys were like top-notch batsmen, seriously talented. I mean, our situation is like this: one great guy says, “I swear, he doesn’t even know how to spell economics.” If I ask him how many types of economics there are, he doesn't even know that. And this is the state we’re in.
00:54:08
He says, yeah, absolutely, the coming times are really promising. Our capacity on the right side—believe me, Chat JPD and these folks have totally wiped out dishonesty now. Like, earlier if I had 10 people working under me, now honestly, even one person who just picks up my file and puts it aside is enough for me. The rest of the work, Chat GT is doing it, plotting it out. You’re doing exactly the same thing, 100%, exactly the same. All the school kids are topping, yeah, 100%, absolutely. The government’s situation is really bad. Yeah, it’s just like that, just like that, absolutely. Now, there are three kinds of criteria. Two—
00:54:56
There are different kinds, right? Yesterday, I also talked about qualifications. These are really important things. What I’m saying now, I told you yesterday—you’ve already picked up 20% from me. If you’ve understood that qualifications always belong to the firm, not the product you’re going to purchase, then that’s already stuck in your mind. One more thing: eligibility always depends on the bidder. Evaluation always depends on the bid. If you get this point, you’ve already grasped 50% of the recommendation. I’m repeating myself—eligibility is always about the bidder, and evaluation is always about the bid. So, I...
00:55:28
I’ll prove it. What does Section 25 say? It’s right here in front of you. We always say the bidder should be registered with the tax authority. Don’t we say that? The bidder should not be blacklisted. We say the bidder shouldn’t be a defaulter. The bidder should have at least three years of relevant experience. All these things are tied to the bidder. And eligibility is always given to the bidder. Got it? That’s how it works, sir. And the evaluation is of the bid, which I’ll explain on the next slide. The minimum quality, we always call it the knock.
00:56:04
Out of classes. If you mess up even one of these, you’re out, no second chances. I’m talking about these four or five knockout parameters. If you fail in even one, you’re done for. Legal capacity to enter into a contract. What does the 1872 Act say? That you must have legal capacity. You can’t be a minor—meaning under 18—or of unsound mind, like an idiot or lunatic. You know this better than me. Yeah, lunatics and idiots are obviously completely clueless. And a lunatic is someone who can suddenly lose it at any moment—these days, that’s pretty common. Exactly. Alright.
00:56:48
Who comes under alien enemy? India, sir. I said, you said wife Israel. Okay, got it. Madam said wife, but that’s not why, no sir. Okay, not Indian. This is from the Forex Manual, Chapter 3, from State Bank. It says only Israel and India are mentioned that if you want to trade with them, you need prior approval from the federal government. So, it’s only for Israel, okay? Keep this in mind. And a foreign representative means an ambassador who is in your country to protect their own country’s interests. That too.
00:57:34
You can’t apply in just any building. Clear? Should I go on? They need to have at least the technical proficiency, equipment, and plant that you mentioned. I gave the example of the Bank of Fiber yesterday. That’s the minimum they must have. Plus, they should also have relevant certified experience. There are four types of eligibility. Number one is the tax eligibility. This means they need to be registered with the tax authorities of that country or state. Like an NDA, for example, GST.
00:58:14
If it's about services, then it's the Khyber Pakhtunkhwa Revenue Authority. This is what they call tax eligibility. Number two is the professional body's eligibility. If you're not registered with the Pakistan Bar Council or the KP Bar Council, then what kind of work is that? That's a problem. So, it's important to be registered with the professional body. For example, if my department’s E-Procurement panel hires lawyers and they're not registered with the PEC or PAC, then it’s of no use. That’s their professional body. If you hire a firm, like a really good contractor, but Pakistan...
00:58:52
It's not even registered with the Engineering Council. Period. Just like how medicines or any medical hospital must be registered with PMDC. Each department has its own eligibility. For example, if you want to deal with weapons or something similar, you have to get clearance from the Army's department in your area. When I installed an incinerator machine at MMC Maddan—that machine burns waste—we needed clearance from the EPA, the Environmental Protection Agency.
00:59:24
Had to go to the protection agency. If you want to hire a security firm, by the way, SCP is only for two things, as far as I know. One is for a security firm to be registered with the SCCP, and the other is if you want to convert foreign currency, like dollars to euros or euros to PKR, then you also need to be registered with the SCCP. Medicines require DRAP approval, as I’ve already mentioned. There’s a fourth one you often see at hotels—a license to operate or a license to import. For importing, the importer falls into one of four categories I mentioned yesterday: manufacturer, authorized dealer, importer, and so on.
00:59:58
For imports, you always need government approval, but these days, wherever you go, in any good hotel, you’ll see that Food Safety Authority certificate displayed right behind the counter. That license to operate means the government has given them permission to run the place. There are four types of eligibility: number one is tax clearance, second is professional, third is departmental, and fourth is the license to import or export. These are all the eligibilities you need. You shouldn’t be bankrupt—section 25 says that—but you have to prove it yourself. That’s on you. Capra in.
01:00:32
All these things, like the text or anything with text, you can verify online. You should verify both these documents online. Don't be at the stage of winding up your business—that's not for you. Just leave it. This is meant for big businesses that have fulfilled all their legal obligations and are following the law properly for now, as you know better. Blacklisted firms can't participate. Those with ongoing litigation can participate. There’s litigation going on with Chitral. Federal.
01:01:13
On Pepra’s website, it’s clearly mentioned that you or anyone else can handle litigation. Because of this, sir, you can’t remove the district—it’s already happening in Chitral. And yes, that’s right. So out of these, we have those four classes that were completely knocked out earlier. From these, we created a criteria and we’re planning to get one or two generators, 200 KVA each, for your courts. Now, coming to the practical part which you’re going to do shortly. Is that clear, sir? Now you have to decide whether to get generators, solar, or whatever else you want for your servers.
01:01:47
Assume whatever you want in your mind. But I always carry the generator with me. That battery needs to be registered with the tax authorities. I haven’t written KPRA here. It’s goods, got it? Whether it’s the manufacturer or an authorized dealer. It’s a single-stage two-envelope process. Okay, sir. It’s single-stage two-envelope because I’m not interested in buying from a general auto supplier. This is a settled area—Mardan, Peshawar, Nowshera—where I work, so that’s fine. But maybe in Chitral, I might have to go through some general order supplier or DI.
01:02:17
In Khan, but in the Central District of Abbot, all the authorized dealers are present—Siemens, Greaves, Honda, Perkins—they’re all there. And the best of the best, I’ve forgotten the name, they might be there too. None of them are unauthorized, absolutely not. After that, we’re saying this: nowhere is it written that you need a minimum of three years of relevant experience. Even if someone registered just two days ago, you can still write that. It’s not necessary to write one year either.
01:02:48
Yeah. You can even write six months. You can even write up to one year, which could be four days or the full 365 days. Got it? So, you can write it; it’s not written anywhere officially. The undertaker will give a stamp paper saying they’re not blacklisted. Wahid, all these things—everything—are verifiable online. All the eligibility criteria are directly listed on the FBR and their website. The authorization is usually mentioned on the manufacturer’s website, saying that this person is the authorized dealer for their company, and...
01:03:26
The ear certificate and NTA mention the date of registration. Never blacklist yourself. Ask your superintendent or clerk to go to the KERA Papers website and check the blacklist of firms. Search that name there – if it comes up, it’s a no-go; if it doesn't, then it’s okay. If you want, like I said, no joint ventures will be accepted. Think of a joint venture as two builders teaming up. Can I say "we" then? No, I want a single bidder – just one person, because tomorrow I’ll...
01:04:01
He’s gotta provide after-sales service too. If those two start fighting, they’ll become a nightmare for me. So, it’s better if I’m the sole builder. I can handle this one alone. I can easily blacklist him. And if any of their security personnel are out, then they’re out – maybe with someone else, and they’re not participating for you. Yeah, that’s possible, he can be your source. You guys should join forces for the JV. Those two will submit their agreement along with the bid – me, Miss Kalsoom, and Miss...
01:04:44
Sadia and I have already done a joint venture and agreed on these terms and conditions. I’m the lead with a 70% share, and they have 30%. This is all documented in an agreement, maybe one or one and a half pages, on a stamped paper. They can’t do it with anyone else. If they have an agreement with someone else, they haven’t submitted that document here. We’re not talking about forming a new partnership. They brought two businesses for me to manage in Chitral. Both were just formed today for your district. The new partnership belongs to them. And partnership means two, three, or even four people can do it.
01:05:20
You said not to write an entity. You write one year. You said a four-day one can also come, but if you write four days, that won't be allowed. I wrote three years, so someone with two years and 264 days can’t come. It's mandatory. That's why I’m saying, this suits me—I said, don’t write three years, write one year, but not less than that. The rule you wrote is Rule 39, so follow that accordingly. Are you all understanding so far? As soon as we uploaded and downloaded the technical bid from the keypad and handled these four bits...
01:06:21
There were five bidders who participated in the first generator. When we checked bidder A, everything was fine—eligible. Checked bidder B, all good. Checked bidder three, all good too. When we checked the fourth one, his name wasn’t on the active taxpayer list with the government. You can also check your own ATL. You can check mine too. Through the CNI, you can check any business online. This one bidder didn't have it. So, we declared him non-responsive. And bidder E, everything was completely clear with them. So, move ahead. What happened next? We just didn’t proceed with that guy.
01:07:00
When we checked the eligibility of the bidder during the knockout classes, it went here. Now, we have to evaluate the next four — A, B, C, and E. D got knocked out. I told someone yesterday that you also had a question due here. I can’t remember who right now. The best evaluated bid doesn’t always have to be the lowest price. That era ended after 2012. Now, you can pick the second lowest, the third lowest, or even the fourth lowest. The only condition is that you have done your bit.
01:07:44
The documents already say that I will decide based on the highest ranking fair bit, not the lowest pay. There's an easy formula for this coming up in about four or five slides. You just need to put that formula into your document beforehand. If you don’t have it, get the document from me. It's all set up—you just need to add your district name where it says "District and Session Judge" and fill in your details and advertisement. Everything is already incorporated in there, including the formula.
01:08:15
I’ve done it. So, this isn’t for goods and services. Is that clear now? For works and non-consulting services, we go for the lowest bid. We go for the lowest. But the lowest responsive bid is evaluated. Like I said yesterday, if a bid isn’t responsive, it’s not considered. I even gave an example: if bids of 98 million, 92 million, and 98 million aren’t valid because you’re not registered with the Pakistan Engineering Council, then sorry, the 92 million bid is out. We’ll give it to the 94 million bidder. We could even give it to the 98 million bidder. I gave this example yesterday, alright? So, works and non-consulting...
01:08:57
In services, the lowest responsive evaluated bid goes first, followed by the highest ranking paired bid. We’ve already gone through the formula. This is the law. I’ve literally copied and pasted Section 21C, which explains how you have to make the best evaluated bid. This applies to goods and consulting services. Yesterday, I explained that for consulting goods and consulting services, you go with the highest ranking paired bid. Quality will be considered the primary factor and cost the secondary factor. The top ranking in the list—you’ll see that in three or four slides. Technical...
01:09:41
Once the Marks plus Financial scores are open, there's a formula to combine these scores—even a fifth grader can understand it. When you combine both, you'll get the ranking. No matter how high the price goes, for goods and consulting services, you'll go with the highest-ranked pair bid. Quality will be the primary factor, and cost will be the secondary factor, respectively. For weightage, we'll give some technical weightage and some financial weightage, which you'll mention in your evaluation criteria.
01:10:14
The weightage for bid solicitation documents is also explained later on—you can assign whatever weightage you want in your bid documents. But the technical part will have a higher weightage, and the financial part will have a lower one. It could even be 49-51 or 51-49: like 51% for technical and 49% for financial. Are you all getting this? It’s a bit of a dry topic. Okay, sir. So, you’re saying 51-49? That’s what they themselves say. Under no circumstances should the technical weightage be less than the financial—meaning technical should be higher and financial lower, like 49-50. But what do we usually do as best practice? 70-30.
01:10:57
Usually, in 70-30, I give 80% weightage to technical factors and 20% to financial factors in medical equipment. The price varies a lot, but we stick to 70-30. In your case too, it's mostly 70-30. Yesterday, I mentioned the same thing and said that the highest ranking is for goods and consulting services. This slide has nothing to do with you at all. Absolutely no connection. But from complex to end, I just wanted to point out that even in civil works, the highest ranking is possible.
01:11:30
But yesterday, I studied eight types of committees, guys. One of them is the PND Committee Secretariat, and its job is to give approval. If you want to build another tunnel, bridges, or do something else around Babusar Top, they say don't just give the contract to any regular contractor. Instead, go for the one who ranks at the top and offers better quality for the price. You can go with that. But you don’t have anything to do with this process. Now, whatever other civil works there are, the higher-ups handle all those at the lowest cost.
01:11:57
We’ll cover the non-consulting stuff that you usually do in your routine. Like, you do civil works at the lowest level, and just wanted to mention the non-consulting services as well. Generally, the evaluation parameters are the same ones I taught you yesterday — company profile, relevant experience, past performance, managerial or any technical skills — these are the standard parameters we’ve been discussing, and that I’ve been asking you about since yesterday. Now let’s move on to the evaluation criteria. If there’s any issue with eligibility, please let me know.
01:12:30
Let me talk about the evaluation criteria. There's an issue with eligibility that I just explained a little while ago. Got it? The knockout clause. If you're out in even one class, that's it—knocked out. You can't take it forward. We've already eliminated one out of the five because of the non-active taxpayer list. Sorry. Now, if on the opening day they don't meet the criteria, then what will they complete later? Yeah. Whatever happens, the bid submission decision will be based on the bid submitted by the respective deadline, 11:00 AM on October 18th. No documents will be accepted after that.
01:13:09
So yesterday I was giving examples, like "Sir, they are my relatives," and "they’re my relatives," and that’s it—it's done. Now, it just can’t happen at all, it’s set in stone, no changes possible. Usually, it’s from there that it gets involved, but honestly, I don’t know. Just remember, the lowest and responsive bids—responsive, I’ve already explained to you. If those four or five things are right, and they’re worth it, then Pakistan Engineering Council will be involved too. I mean, sir, our team doesn’t deal with bureaucracy stuff; they’ll do the job as proposed, as proposed, obviously. Now, they will do exactly that job, as proposed, by the CNW.
01:13:59
Sign it at the department so you can send it to the CW guy. Tell him to get it written and brought by the CW folks. That's it. If there's a work issue, even the CAW guys aren’t any good—really useless people, man. Seriously useless. Sometimes, it hits me deep down, may Allah have mercy. It shouldn’t be like this. Allah said in the Quran that He’ll make some people fuel for hell. Because of what I’ve been through. Sometimes I think those doctors and the CM guys will end up together—all in the same place. Because I’ve dealt with them.
01:14:52
It's a big problem, and these people are really heartless—they just don’t care. Look, since 2012, nothing has been done. Back in 2012, Amir Haidarti laid the foundation for the Children’s Hospital in Maddan. Till now, it’s still not built. It hasn’t been done properly even once. We managed to run something by force, but it didn’t get completed. They keep committing atrocities. Atrocities. Take this building you’re talking about with the cafeteria—these people are so cruel. They say they’ll pay ₹16 lakh to demolish it, and then there’ll be a new estimate after that. It’s just like that, sir, pure injustice. Even to demolish, they charge ₹16 lakh. They make you pay all these bribes, like ₹600, ₹600 here and there, just like that.
01:15:30
Yesterday, we talked about what a technical bit is. Let me ask you again—what exactly is a technical bit? Yesterday, I taught it, made you write it down, and explained it too. A technical bit is basically a quick guess or estimation. In finance, everything is technical. Like I said yesterday, yes, that's good. I go along with the teacher, and I go along with both of you too. Now, a little next-level stuff: product performance plus firm performance equals technical. What you're about to buy, combined with how well the company is doing, is called the technical print, which we consider good.
01:16:16
This is how we do things. Just like that. Okay, let me tell you something even more interesting. Let's take a step back for a minute—this is really fun. I want you to keep this in mind so that tomorrow you’ll know that sometimes, things can actually be like this. We had to get school bags in a KP district. School bags for the kids, from the education department. I want you to respond to me. I'm asking you: if I write something above the serial number three in that place, and create another row saying “bidder must be registered with Pakistan Engineering,” what would you say?
01:16:56
Council category four or category three or category D should be for those carrying goods. Why shouldn't this class exist? There’s no revenue, no revenue. That goods chapter is related to civil works. A DEO, District Education Officer, did the same work in one district. Some time ago, last year around March or April. All the other bidders went to the DO asking, “Hey, what’s this for?” He said, “No, no, this is a big project,” and the PC probably thought it wouldn’t be noticed at all. “No, no, it’s a really big project.”
01:17:35
It's a district. I had to set up the Pakistan Engineering Council. Five or six bidders went straight there. A letter was sent to them. They didn't respond. They wrote back saying it's a big project, and they can't handle it. Then, four or five went directly to KEPRA. Within 15 days after the second hearing, KEPRA communicated the decision saying, "Hey, you've applied under the wrong category, you can't do that." Later it was found out that one of their relatives held the same category in the Pakistan Engineering Council. They had come up with this new tactic to give him an advantage and knock out everyone else.
01:18:05
So, these things are introduced way too much, which shouldn’t happen. Product conformance and firm performance—the stuff you’re about to get—is a bit of a dry topic. I’ll need your full attention. We have to buy a generator. We gave that generator 46 marks. 46 points, okay? It’s a bit dry, so please pay attention. Then I remember what that lady said about how many days it took you to learn. So, just show a bit of patience, okay? Alright. The product has 46 marks, and the pump has 64 marks. If... then you give me my...
01:18:49
This specification is for a 200 kVA generator, and if you give me that, I'll give you 46 marks straight up. But what kind of game does the guy messing with you play? Whatever specification you give, it's always shady. What does he write in the second row? Just an "S" specification. He doesn't even mention the brand name or attach a brochure. So you have to make it clear to him: you must mention the brand name, give the horsepower, specify whether it's Dell, Lenovo, Shark, Perkins, Honda—whatever it is.
01:19:22
Which generator are you bringing from Greaves? Give me the brand name. Are specifications not accepted? What do you mean by my specifications? Tell me your brand and the model you're going with, and also submit its brochure along with it. And if we do one more thing together, well, then it will be fully verifiable online—that's a bit tough. In the areas where you live and work, it’s a bit challenging. So, I'll give it 46 marks and 40 points, and I’ll accept a maximum of three deviations. Those three deviations are the ones related to this entire product.
01:19:56
Effectiveness won’t be affected, but performance won’t change either. Now, if I ask you a question: you set the condition that the laptop must have three USB ports, but Dell only offers two ports. Does that affect the overall performance? No, it doesn’t, it’s not a big deal. It’s the same thing, sir. Yeah, you said you wanted it for your accounts person, the keyboard—sorry, sorry—and you had the condition that it must have a calculator site, and if it doesn’t, that’s called major deviation. Sorry, my bad, that’s a major deviation, not a minor one.
01:20:39
Because that was your requirement. Clear? Why did it shut down, man? The computer shouldn’t be turning off like that. If there are more things like this, they’re major issues. Like if you said you wanted a movable generator, but you said fixed and someone brings a movable one, or you said movable and it’s fixed—that’s not a big deal, that’s just a minor difference. If you asked for wheels on it but without affecting performance, and the manufacturer isn’t even making that—they’ll say, “Hey, I can’t make that for you, can’t customize it,” that’s just how it is.
01:21:14
We have our approved standards, so those things don’t affect it. You just need to keep in mind these standards. For example, if there are four—like HP, Delnova, Sharp, or a generator—we’ll talk about it—we’ll calculate the maximum deviation for three, giving two points against each deviation. If it’s less than 40 points, then it’ll be declared non-responsive. There was a major deviation like not providing a calculator, so that product got rejected. Let’s keep focused here, please, because this is what you need to do.
01:21:46
Inshallah, we’ve seen his relevant experience in firm performance. For the settled areas, especially on the Ahmedabad side, I’ll specifically say this, and for the upper areas, they just need to manage somehow, it’s okay. For five performances, if you’ve installed generators in the public sector, I’ll give you three marks for each generator, and you need to submit the purchase order along with a satisfactory report from the department. So, I’ll give you 5 times 3, that’s 15 marks. I’ve been saying since yesterday that creating evaluation criteria isn’t Kera’s job.
01:22:17
It's your job. That's my job. So you can add or subtract this as you like. It's not like some divine scripture or the Bible, alright? Just keep that in mind. You decide what to add or subtract. This is exactly what I tell the guy: if you’ve installed generators in two places in the private sector, I’ll give two, three, six points. So, 36 + 15 + 67 total. Because you have generators, if you have the relevant certificate from the Pakistan Engineering Council, the firm keeps that on record. That's what the builder handles accordingly.
01:22:50
Here’s the code, these three numbers—we’ll even give you extras. Our engineer said that if it works out, that’s great. We’ve already put them in. Now about this equipment—yesterday you guys asked a really good question. You asked me where exactly DU1 should be used, and what’s the deal with DU1 anyway? It’s an item that needs after-sales service. I need to get the oil changed, filters replaced, so obviously, it should have some decent HR capabilities too. We don’t want some bidder showing up just to throw a sheet around and leave. It shouldn’t be that kind of guy. Then...
01:23:20
If they're bringing in authorized dealers, then it's better if they have an engineer or at least a diploma-holding engineer or an associate engineer. We'll give them marks accordingly. If they don't have that, no problem, they'll just get zero marks. Like, for example, if your financial worth or turnover isn’t enough, then on the day you give the purchase order to Asghar Sahab, and he goes to madam the next day saying there’s no money for the contractor, “Give the money,” how do you think your own worth stands? This is where it becomes clear when they submit their documents.
01:23:52
If you've worked between 500 and 700 million in the last three years, just say so. And if it's above 750 million, let us know that too. I've attached the document—getting what I'm saying? Now, these evaluations are happening for those four bidders. Keep in mind, A, B, C, and E—these four groups are not being evaluated under this. This criteria was made by this committee. These four guys made it. When you advertised, it was your committee that did it. If your KP has service support facilities, then that's great. If it's in Khair Pindi...
01:24:25
If it's in KP, then the judge is out of KP, so you won't get any marks. In Peshawar, if it's in KP, then I'll give you three marks. If you need service or support, and if either your firm or product is ISO certified in KP, then I'll give you four marks. Now, these general order suppliers are basically zeroes—they just keep dropping out. That's how it is, right? If you’re working as a judge in a good area, then it’s fine here—I’m not talking about Chitral, where there’s some flexibility. But over here, at least...
01:24:53
They're good. You guys can do it. How long is the standard warranty? For anything you buy, what's the standard warranty? It's one year. Yes, one full year. In the CAPRA rules, somewhere it mentions 18 months too. But the standard meeting document also states it clearly. So, whatever we take, the standard warranty is one year. But if you have a bit of budget flexibility and some negotiation power, you can also do this: if someone offers me a warranty longer than one year, then technically, I give them five extra marks. And if they offer it for more than two or even three years...
01:25:27
If it's about that, I'd give it a perfect 10 here. All these local Chinese brands tend to slowly weaken over time. Nah man, this one won't leave us hanging. And then here, you’ve got Perkins, Honda, grease—it all comes up again. The real competition is among the big players. Got it? But like I said, this applies only in settled areas. Don’t let it happen that tomorrow you won’t have this thing working properly in Chitral. Maybe you tried it a bit lightly there. Even there, it happened that the success I got after so many years was exactly written down on paper back then. We had a total of 100 marks—full 100 marks. Out of these 100…
01:26:10
So, in our evaluation criteria mentioned earlier in point 391, it was stated that only those bidders who score 70 or above will have their financial bids opened. Keep yesterday's discussion in mind. According to our criteria, the committee has clearly said that for those who get 70 or more marks, only their financial bids will be opened. Now, moving ahead. These four members of the committee are ours. When they did the evaluation—there are four categories: A, B, C, and E—how many marks did A get? Out of 100 technical marks, B got...
01:26:49
C and E, one of these bidders took 70 or less. So how many are left? The financial bids will be opened for these three only. Now, at this stage, the session judge will come. All four builders can come to you. Actually, this one—sorry, the one labeled B, Saeed Sahib—can come to you and say, "Brother, they gave me the wrong numbers. Please fix it." If you can’t satisfy them within eight days, then these bids will go to CAPRA. CAPRA will then decide whether to stop the process here. Is that clear? If so, fine—they won or got 71 or 70.
01:27:28
Will they go or stay at 64? You just communicate the decision to them. So if, in the routine, this guy really gets disqualified, then financially it’s only about these three, and we always have the member sign below, approved by the competent authority. What report do we disclose, or do we not disclose it? I’ve been saying since yesterday that you need to create evaluation criteria and upload it so every bidder knows. Then what will they do? What will they do? Sorry, it’s just their question. I want to say, sir, according to this...
01:28:11
He’ll make sure to give you that I’m bringing in greaves. This is my performance. I’ve done it in DI Khan, in Edabad, and also in Pohat. I’ve even done it for a UN organization in University Town for the private sector. Based on this, they’ll issue their purchase orders, prepare their technical bids, and upload them. Whatever you asked for, they’ll prepare it exactly like that and give it to you in the same order form. What will they do for you? They’ll provide their PC registration. They’ll give you the names, like one Khalid who’s an engineer, one Asif, and some others.
01:28:38
It’s like this. Everything has to be made and disclosed accordingly. If you even hide one thing, you'll be held accountable for it tomorrow. I mean, it could be used against you in CAPRA. They’ll know you didn’t disclose it and that you’re doing something wrong. You have to disclose everything to them. The board has to clearly know how much warranty to give. If you give just a one-year standard warranty, you get zero marks. If you give it differently, you get marks accordingly. So when the committee sits down, some might get 70, some 80, some 91. That’s how the result will be.
01:29:10
Here it is in colloquial English:
"It's done, sir. Disclosed. That’s why I’ve been saying since yesterday, you need to create three things to upload, you’re saying to share, and this is a back-and-forth discussion about the purchasing video. You’re saying to share? Alright sir, these two don’t belong to you, this is the department's domain. You work together on it, it’s not up to you alone, it’s their authority. I won’t give permission. You’ll decide together as one entity what’s best. Should I continue, sir? It will be opened. I’m moving ahead. I’m going according to that, exactly. Yes, you’re the department. If any one of these..."
01:30:07
Once you get it, you’ll have to decide on the DC within five days, and I’ll teach it today within the next three days. Within these three days, you also need to communicate to Mr. Saeed why my committee gave you 64 marks. Either this will quietly get pushed aside, or if it’s not satisfied and quietly pushed aside, then you can open up the financial part. Otherwise, this camera is 50% against you there, which, God willing, we’ll handle today. So, what will happen now? These three or four points have been understood, out of which three are clear. Now we’ll move on to the financial bill.
01:30:43
We'll open it as soon as we’ve opened the financial budget and given it some time. You see, we announced the results among these four already—that's why it came to you then. For the others, usually, they get about 10 days or so. After 10 days when we upload it, the EPDT will tell you the exact date to fix for the financial budget opening. We opened the financial budget around October 18th, and then after about 10 days, around October 28th, we moved on to evaluation, innovation, and all that.
01:31:14
On November 5th, when we did it, Bidder A came in with a generator price of ₹23 lakh. Bidder B quoted ₹25 lakh, and C and E both came in at ₹26 lakh. Look, E and D were out, and E was also out. A and B were out, and D was out too—something like that. When we opened the financial bids for these three, these were the respective prices. If this was a civil works contract, then who would the contract go to? Very good. You’re with me, right? You’re with me, inshallah. This is the only thing I liked—that the contract automatically goes to the ₹23 lakh bidder. God willing.
01:32:00
We've figured out the highest ranking pair bit. Now, here's a request: those who are good at math, please take out a calculator. For those good at math, I'll just show you how it's done. If you go back a bit, you would've seen that A got 78 marks, C got 63, and E got 91. It was something like that. Now, what weightage did we give? When I take 70% of 78, how much does that come out to? About 54.76. When I take 70% of 83, it comes to 51.8. And when I take 70% of 91...
01:32:49
It comes out to 63.7. Is that clear now? So, what’s the formula? What I’m saying is, even my little daughter can easily do this. The formula is: as soon as we open the financial option, the lowest bid price among all of them — which one is the lowest price? It’s ₹3 lakh. ₹3 lakh will always stay at the top in the formula, and whoever has to do it, you bring it down below. But the lowest will always stay on top, got it? If you don’t understand, please ask. If you still don’t get it, ask again. Even if you ask a third time, I don’t mind. There’s no problem with that.
01:33:32
No, it's not like that. The technical weightage of 546 has come in. Instead of adding it, you have to extract a weightage of 70. Once you do that, look at the price formula with 2.3 million on my side, 2.3 million. I’m doing the same here—dividing by 2.3 million and then multiplying by 30. This way, the full 30 marks are given, and they have actually received those 30 marks. If you do it yourself, it’ll come out the same. Now, someone else has to do this. Yeah, dividing 2.3 million by the same number, 2.3 million. The price under consideration is the same as before, multiply always by 30 because it’s 70-30. If it were 80-20 here, then...
01:34:15
If it were 20 instead of 90-10, and here it's 10, then let's do 23 lakhs times 30. Well done, so I just gave it a financial weight of 30 here. It'll be clearer if you do this: take 23 lakhs, make it 25 lakhs below and above, and multiply by 30. So, 23 lakhs above, 25 lakhs below, multiply by 30—see how much that comes to? 23 lakhs, right? Very good. Your math is like this: if it’s 26 lakhs, 23 lakhs above and 26 lakhs below, multiply by 30, then add the technical weight of 26.54 to the financial weight of 30—so, 54.6 plus 30 equals... equals what it equals. That’s how you do it.
01:35:29
I submitted it, and now in law, if it were civil works, the tender would have gone directly. But here, when we looked, the technical and financial weightage got the highest ranking, fair bit of the weightage. However, which contract topped the list? With the weightage, you can see who’s at the top? This one is. Its price is the highest. Still, the law says the contract should be awarded to it. So, what’s the logic now? The logic is that this guy has also given you an extended warranty. He’s responsible for the performance as well. It also has financial worth. Its...
01:36:03
The product is number 46, and it’s performed pretty well compared to others. It also has a lot of relevant experience. When combining technical and financial aspects using the standard KP PEPRA formula, it scored 90.24 marks and achieved a ranking. So, it came first, or maybe second or third, and the contract will be awarded to M/s E, who is serial number three. M/s E is recommended for the contract award for having the highest ranking, which is fair and in accordance with Section 2 of the KP PEPRA Act.
01:36:38
2012 signed off by the member, approved by the head of the department. He's calling it a very good price, saying let's drop the price from tomorrow. Like I've been saying repeatedly, technical skills carry more weight — experience, exposure, and quality come at a lower cost. That’s the thing. When quality is pushed to the backseat, technically he was a very capable guy. Got it so far, everyone? So, what time’s the break, sir? Sorry, yeah, today I was told you just have to drive the bus. Yeah, yeah, it’s quarter past five today, alright. If you’re in the mood, we can fix the working. If you’re in the mood, we’ll just stick to that. Just a bit.
01:37:21
Let's take a rest. Okay, I’ll give you a 5-minute break now. Be back by 10:05. Alright. Go ahead, have some sugar. This is amazing, seriously amazing—just gotta understand it, that’s all. Take my presentation, take the documents I’ve prepared, just hand it over to Mardan in Chitral, I swear it's just like an iPad, exactly like an iPad.